Skip to content
All Posts
Project Management
3 min read

How Construction Cost Estimates Impact Scope, Schedule and Budget

The CrewCost Team
Published Nov 2, 2023

A construction cost estimate is a forecast that predicts the total cost to complete a construction project. This estimate is a detailed compilation of all the direct and indirect costs associated with a project, including labor, materials, subcontractors, equipment, permits, and overhead. It lays the groundwork for creating a project budget and is an essential element for you when you bid on projects or need to secure financing It also lays the groundwork for managing project expenses effectively.

Impact on Project Scope

The project scope defines the parameters of what the project is set to achieve. A construction cost estimate is critical element for defining the scope as it provides a quantitative measure of what can be achieved within the financial resources available. It gives you the ability to:

  • Assess the feasibility of the proposed design and materials.

  • Identify areas where costs can be optimized without compromising on quality.

  • Make informed decisions about project scale, complexity, and the potential for phased construction if necessary.

  • If work exceeds the agreed-upon scope, change orders can be submitted to fund the additional requirements.

If a cost estimate exceeds the owner’s budget, the scope of work may need to be adjusted, whether by downsizing the project, altering the quality of materials or by other means. Conversely, if the estimate is lower than the budget, it could open up opportunities for scope expansion or enhancements.

👉🏻 Read Mastering the Iron Triangle of Project Management to learn more about this concept. 

Impact on Project Schedule

The project schedule outlines when each piece of the job will be completed. Accurate construction cost estimates impact the schedule by:

  • Informing the duration of tasks by correlating cost with labor and resources.

  • Helping to anticipate and allocate time for procurement of materials and equipment.

  • Highlighting potential financial constraints that may cause project delays.

An underestimation of costs can lead to funding shortfalls that interrupt the project flow, causing delays, while overestimation can lead to unnecessary downtime as resources may not be optimized. An accurate estimate ensures that the schedule is realistic, with all activities properly funded and resources scheduled for optimal use.

Impact on Project Budget

The project budget is the financial plan that reflects the total cost for all components of the project. The accuracy of the budget impacts the project budget in several ways:

  • Cost Control: An accurate estimate gives your Project Manager a budget to track and control costs throughout the project lifecycle, ensuring that the project remains financially viable. So, if labor costs start to exceed the estimated cost, the PM can address the issue before the entire job is in the red.

  • Cash Flow Management: It helps in planning the cash flow, so contractors know when to expect expenditures and can plan for financial obligations accordingly.

  • Financial Reporting: Provides a baseline for financial reporting and accountability to stakeholders, such as investors, clients, and the project team.

  • Profit Margin Analysis: Enables contractors to determine the profit margins and adjust bid strategies for future projects.

Cost overruns can deplete financial resources and jeopardize profit margins, while cost underruns, although less harmful, can suggest that a project could have been approached with a more ambitious scope.

Best Practices for Accurate Construction Cost Estimates

Building an accurate estimate of project costs comes down to a few key practices. They include:

  • Comprehensive Review of Documents: Thoroughly review all project documentation, including plans, specs, and contracts.

  • Market Research: Stay abreast of market trends, price fluctuations, and material availability.

  • Stakeholder Collaboration: Work closely with architects, engineers, and subcontractors for detailed insights.

  • Continuous Learning: Learn from past projects to understand where estimates were accurate and where they diverged from actual costs.

Don’t Overlook the Importance of Your Estimates

An accurate cost estimate is critical for contractors in the construction industry, especially small business contractors who can’t take lower margin projects. It influences every aspect of  construction management, from the breadth of the project scope to the specifics of the project schedule and the overall project budget. As such, these estimates play a pivotal role in not only winning projects but ensuring their successful execution during the course of construction and project close-out.

By understanding and refining the process of creating accurate estimates, contractors can deliver projects that meet client expectations, are completed on time, and are executed within budget. This commitment to precision in the estimating process is what will distinguish a contractor’s services in a competitive marketplace and pave the way for sustained business growth a small business contractor.

Keep reading: Foundations of Construction Management


Author
The CrewCost Team

The CrewCost Team consists of men and women who have worked in the construction industry as project managers, general contractors, sub contractors and more. They share their decades of experience on our blog as a way to help other contractors grow healthier and more profitable businesses.

Crewcost Blog
Go to Blog
Construction Accounting
3 min read
The Not to Exceed Clause: A Contractor's Friend or Foe?
Read More
Construction Estimating
9 min read
8 Essential Steps to Master Construction Estimating: The Ultimate Guide
Read More
Construction Insurance
5 min read
What Types of Construction Insurance Does Your Business Need?
Read More